Related PDF

Twentyeight-Seven Therapeutics (Cambridge, MA) is a start
1 Twentyeight Seven Therapeutics Cambridge MA is a start up pharmaceutical company developing small molecule drugs
BEDSIDER AND TWENTYEIGHT HEALTH PARTNER TO INCREASE WOMEN
December 18 2018 CONTACT Paloma Zuleta 202 812 4477 pzuleta powertodecide org BEDSIDER AND TWENTYEIGHT HEALTH PARTNER TO
EuropeanElections2014: FromVoterstoRepresentatives
92 EuropeanElectoralStudies Vol 10 2015 No 2 pp 91 124 Introduction The2014electionstotheEuropeanParliament EP tookplaceonthefourdaysbetweenThursday
Parashah Twenty-Eight
1 0 Torahesore a com 0 All 0 rights 0 reserved
DISCOVER A LEGACY THAT SPANS TWENTY-EIGHT YEARS OF EXCELLENCE.
THE CUTTING EDGE OF TRUE LUXURY It starts with a hand picked prime location A
CHAPTER TWENTY-EIGHT - Emanuel Tov
CHAPTER TWENTY EIGHT THE NUMBER OF MANUSCRIPTS AND COMPOSITIONS FOUND AT QUMRAN 1 Total Number
PENDANTS: twenty-eight MOUNTING: white powder coated
sales boci ca www bocci ca europe boci ca www bocci ca 2018 Bocci Design and Manufacturing Inc All rights reserved Any
Twenty-Eight
Special Number Color 28 circles Fill in the empty boxes on the number line
TWENTY-EIGHT -
54709p509 668 indd 579 9 24 15 10 43 AM holz TWENTY EIGHT Subalpine Forests CONSTANCE I MILLAR and PHILIP
Twenty-Eight - SuperTeacherWorksheets
Draw 28 circles Super Teacher Worksheets www superteacherworksheets com Twenty Eight Name
TWENTY-EIGHT BY 28 PROJECT LIST -
ATTACHMENT A TWENTY EIGHT BY 28 PROJECT LIST Project Target Completion Date

Popular PDF

TWENTY-EIGHT BY 28 PROJECT LIST -

ATTACHMENT A TWENTY EIGHT BY 28 PROJECT LIST Project Target Completion Date Current Completion Date Sub region 1 Crenshaw LAX Line 2019 2019 cc sb

Insert your error message here, if the PDF cannot be displayed.



File type: PDF

File size: 213,54 KB

File name: att_a_28x28_list.pdf


	ATTACHMENT 
A
:  
TWENTY
-
EIGHT BY ’28 PROJECT LIST
 
 
Project
 
 
Target 
 
Current 
 
Sub
-
region
 
1.
 
Crenshaw/LAX Line
 
2019
 
2019
 
cc, sb
 
2.
 
MicroTransit **
 
2019
 
2019
 
TBD
 
3.
 
Regional Connector 
 
2021
 
2021
 
cc
 
4.
 
New Bus Rapid Transit Corridor
s
 
(Phase 1) 
 
2022
 
2022
 
TBD
 
5.
 
Orange and Red Lines to Gold Line 
Transit Connector (North Hollywood to 
Pasadena)
 
2022
 
2022
 
sf, av
 
6.
 
 
2023
 
2023
 
sb
 
7.
 
I
-
5 North County Capacity Enhancements
 
2023
 
2023
 
nc
 
8.
 
North San Fernando Valley
 
2023
 
2023
 
sf
 
9.
 
Purple Line Extension Section 1
 
2023
 
2023
 
cc
 
10.
 
Gold Line Foothill Extension to Claremont 
(with ability to extend to Montclair)
 
2025
 
2025
 
sg
 
11.
 
LA River Waterway & System Bike Path
 
2025
 
2025
 
cc
, gc
 
12.
 
LA River Bike Path
 
(plus 
Mobility Hub
**
)
 
–
 
San Fernando Valley 
 
2025
 
2025
 
sf
 
13.
 
Improvements
 
2025
 
2025
 
sf
 
14.
 
Purple Line Extension Section 2
 
2025
 
2025
 
cc, w
 
15.
 
Purple Line Extension Section 3
 
2026
 
2026
 
w
 
16.
 
Sepulveda Pass ExpressLanes
 
2026
 
2026
 
sf, w
 
17.
 
East San Fernando
 
Valley
 
2027
 
2027
 
sf
 
18.
 
I
-
105 ExpressLanes*
 
2027
 
2029
 
cc, gc, 
sb
 
19.
 
I
-
710 South Corridor Early Action*
 
2027
 
2032
 
gc
 
20.
 
Green Line
 
Light Rail Extension
 
to 
Torrance
*
 
2027
 
2030
 
sb
 
21.
 
Blue Line Signal and Washington/Flower 
Junction 
Improvements
**
 
2028
 
2028
 
cc
 
22.
 
I
-
10 
ExpressLanes I
-
605 to San 
Bernardino Line**
 
202
7
 
20
27
 
gc, sg
 
23.
 
SR
-
57/60 Interchange Improvements*
 
2028
 
2031
 
sg
 
24.
 
Vermont Transit Corridor
 
2028
 
2028
 
cc
 
25.
 
Sepulveda Transit Corridor*
 
2028
 
2033
 
sf, w
 
26.
 
Gold Line Eastside Extension to Whittier 
or South El Monte*
 
2028
 
2035
 
gc, sg
 
27.
 
West Santa Ana Branch*
 
2028
 
2041
 
cc, gc
 
28.
 
I
-
405 South Bay Curve Improvements*
 
2028
 
2047
 
sb
 
 
* 
   
accelerated project
 
**
   
non
-
Measure R nor Measure M project